These pressure vessels were manufactured at the company’s workshop in Midsund. The project integrated a wide range of engineering disciplines, including design for multiple load cases such as hydrogen-induced stress cracking (HISC), dynamic impact loads, and fatigue. Advanced materials were utilized throughout, including 15-5 PH stainless steel, 1.7225 alloy steel, 22Cr duplex stainless steel, and 25Cr super duplex stainless steel. The scope also included welding of dissimilar materials, high-precision post-weld machining, and execution of complex factory acceptance testing (FAT).
2025
Four Subsea Pressure Vessels for Geological Research Applications
Geo-research
The engineering phase extended over approximately three years to ensure compliance with all applicable load cases and full conformity with EN 13445 and the Pressure Equipment Directive (PED) 68/2014/EU. Structural integrity and load verification were performed using finite element analysis (FEA) for all components.
One of the key fabrication challenges was managing welding-induced deformations resulting from heat input. To mitigate irreversible distortions that could not be corrected by post-weld machining, all welding activities were carried out in accordance with carefully planned and controlled welding sequences.
The first pressure vessel was delivered and successfully tested in December 2025.